US Army Corps of Engineers

Bonneville Dam

Friday June 5, 2026

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 203.70 41.10150.20 73.10 17.70 55.40 72.90 74.40 17.70
2 203.30 41.00149.90 73.10 17.70 55.40 73.00 74.30 17.60
3 203.30 41.10149.80 73.20 17.60 55.60 73.00 74.30 17.60
4 203.50 41.20149.90 73.20 17.60 55.60 73.10 74.30 17.60
5 203.70 41.40149.90 73.20 17.50 55.70 73.00 74.30 17.50
6 203.70 41.50149.80 73.10 17.50 55.60 72.90 74.30 17.60
7 204.90 42.80149.70 73.10 17.60 55.50 72.90 74.20 17.60
8 204.90 42.80149.70 73.10 17.60 55.50 72.90 74.20 17.50
9 205.00 42.90149.70 73.00 17.60 55.40 72.80 74.20 17.50
10 204.90 42.90149.60 73.00 17.50 55.50 72.80 74.20 17.50
11 204.70 42.80149.50 72.90 17.60 55.30 72.80 74.10 17.60
12 205.10 43.20149.50 73.00 17.60 55.40 72.80 74.20 17.60
13 222.10 60.30149.40 73.00 18.30 54.70 72.90 74.30 18.30
14 223.50 61.50149.60 73.10 18.40 54.70 73.00 74.50 18.50
15 244.20 82.50149.30 73.00 19.20 53.80 72.80 74.50 19.20
16 244.40 82.60149.40 73.00 19.20 53.80 72.90 74.60 19.20
17 256.50 94.90149.20 72.70 20.10 52.60 72.50 74.50 20.10
18 265.30 104.00148.90 72.80 20.20 52.60 72.60 74.50 20.20
19
20
21
22
23
24
AVG 217.04 55.03149.61 73.03 18.14 54.89 72.87 74.33 18.13
MAX 265.30 104.00150.20 73.20 20.20 55.70 73.10 74.60 20.20
MIN 203.30 41.00148.90 72.70 17.50 52.60 72.50 74.10 17.50

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 73.1 72.9 41.10 18 12.4
2 0.00 73.1 73.0 41.00 18 12.4
3 0.00 73.2 73.0 41.10 18 12.4
4 0.00 73.2 73.1 41.20 18 12.4
5 0.00 73.2 73.0 41.40 18 12.4
6 0.00 73.1 72.9 41.50 18 12.4
7 0.00 73.1 72.9 42.80 18 12.4
8 0.00 73.1 72.9 42.80 18 12.4
9 0.00 73.0 72.8 42.90 18 12.4
10 0.00 73.0 72.8 42.90 18 12.4
11 0.00 72.9 72.8 42.80 18 12.4
12 0.00 73.0 72.8 43.20 18 12.4
13 0.00 73.0 72.9 60.30 18 12.4
14 0.00 73.1 73.0 61.50 18 12.4
15 0.00 73.0 72.8 82.50 18 12.4
16 0.00 73.0 72.9 82.60 18 12.4
17 0.00 72.7 72.5 94.90 18 12.4
18 0.00 72.8 72.6 104.00 18 12.4
19
20
21
22
23
24
AVG 0.00 73.0 72.9 55.03 18 12.4
MAX 0.00 73.2 73.1 104.00 18 12.4
MIN 0.00 72.7 72.5 41.00 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.