US Army Corps of Engineers

Bonneville Dam

Sunday April 12, 2026

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 195.60 33.20150.00 74.00 16.90 57.10 73.90 75.00 16.80
2 195.30 32.60150.30 73.80 16.90 56.90 73.60 74.90 16.90
3 194.80 32.50149.90 73.80 16.80 57.00 73.50 74.80 16.80
4 194.70 32.40149.90 73.70 16.80 56.90 73.60 74.80 16.70
5 195.00 32.70149.90 73.80 17.00 56.80 73.60 74.80 17.00
6 194.90 32.70149.80 73.70 16.90 56.80 73.50 74.70 16.90
7 208.10 46.30149.40 73.50 17.50 56.00 73.30 74.60 17.50
8 222.80 61.10149.30 73.50 18.10 55.40 73.30 74.70 18.10
9 223.50 61.70149.40 73.60 18.30 55.30 73.50 74.80 18.20
10 210.10 47.80149.90 73.90 17.70 56.20 73.70 74.90 17.60
11 196.10 33.40150.30 74.10 17.10 57.00 73.80 75.10 17.10
12 194.90 32.30150.20 74.00 17.10 56.90 73.80 75.10 17.00
13 194.90 32.20150.30 74.10 17.00 57.10 73.80 75.10 17.00
14 195.00 32.30150.30 74.10 17.10 57.00 73.90 75.10 17.10
15 195.10 32.20150.50 74.20 17.00 57.20 74.10 75.20 17.00
16 195.30 32.20150.70 74.40 17.00 57.40 74.20 75.30 17.00
17 195.70 32.60150.70 74.40 17.10 57.30 74.20 75.40 17.10
18 209.90 46.90150.60 74.30 17.80 56.50 74.10 75.40 17.70
19 235.40 73.00150.00 73.80 18.80 55.00 73.60 75.20 18.80
20 238.50 76.20149.90 73.90 18.90 55.00 73.80 75.30 19.00
21 238.20 75.70150.10 74.10 18.90 55.20 73.90 75.30 18.80
22 226.20 63.40150.40 74.70 17.90 56.80 74.50 75.40 17.90
23 196.00 32.50151.10 74.50 17.30 57.20 74.30 75.50 17.30
24 195.90 32.60150.90 74.40 17.30 57.10 74.30 75.50 17.30
AVG 205.91 43.35150.16 74.01 17.47 56.55 73.82 75.08 17.44
MAX 238.50 76.20151.10 74.70 18.90 57.40 74.50 75.50 19.00
MIN 194.70 32.20149.30 73.50 16.80 55.00 73.30 74.60 16.70

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.0 73.9 33.20 18 12.4
2 0.00 73.8 73.6 32.60 18 12.4
3 0.00 73.8 73.5 32.50 18 12.4
4 0.00 73.7 73.6 32.40 18 12.4
5 0.00 73.8 73.6 32.70 18 12.4
6 0.00 73.7 73.5 32.70 18 12.4
7 0.00 73.5 73.3 46.30 18 12.4
8 0.00 73.5 73.3 61.10 18 12.4
9 0.00 73.6 73.5 61.70 18 12.4
10 0.00 73.9 73.7 47.80 18 12.4
11 0.00 74.1 73.8 33.40 18 12.4
12 0.00 74.0 73.8 32.30 18 12.4
13 0.00 74.1 73.8 32.20 18 12.4
14 0.00 74.1 73.9 32.30 18 12.4
15 0.00 74.2 74.1 32.20 18 12.4
16 0.00 74.4 74.2 32.20 18 12.4
17 0.00 74.4 74.2 32.60 18 12.4
18 0.00 74.3 74.1 46.90 18 12.4
19 0.00 73.8 73.6 73.00 18 12.4
20 0.00 73.9 73.8 76.20 18 12.4
21 0.00 74.1 73.9 75.70 18 12.4
22 0.00 74.7 74.5 63.40 18 12.4
23 0.00 74.5 74.3 32.50 18 12.4
24 0.00 74.4 74.3 32.60 18 12.4
AVG 0.00 74.0 73.8 43.35 18 12.4
MAX 0.00 74.7 74.5 76.20 18 12.4
MIN 0.00 73.5 73.3 32.20 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.