US Army Corps of Engineers

Bonneville Dam

Saturday April 11, 2026

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 190.10 32.70145.00 73.70 16.40 57.30 73.50 74.80 16.40
2 189.60 32.60144.60 73.60 16.40 57.20 73.50 74.60 16.40
3 189.60 32.60144.60 73.50 16.40 57.10 73.40 74.60 16.40
4 189.50 32.70144.40 73.40 16.30 57.10 73.30 74.50 16.30
5 189.40 32.80144.20 73.00 16.40 56.60 73.00 74.30 16.30
6 189.20 32.80144.00 73.20 16.40 56.80 73.00 74.20 16.50
7 189.20 32.70144.10 73.50 16.70 56.80 73.40 74.40 16.40
8 189.90 32.90144.60 73.70 16.40 57.30 73.50 74.60 16.40
9 189.70 32.60144.70 73.80 16.50 57.30 73.60 74.70 16.50
10 189.70 32.50144.80 73.60 16.40 57.20 73.40 74.70 16.50
11 189.00 32.30144.30 73.40 16.40 57.00 73.50 74.40 16.30
12 188.60 32.00144.20 73.40 16.30 57.10 73.30 74.40 16.30
13 188.90 32.20144.30 73.40 16.40 57.00 73.30 74.40 16.50
14 188.70 32.20144.10 73.30 16.40 56.90 73.20 74.30 16.40
15 188.80 32.50143.90 73.20 16.40 56.80 73.10 74.20 16.30
16 188.60 32.40143.80 73.10 16.40 56.70 73.00 74.20 16.40
17 188.30 32.20143.70 73.10 16.30 56.80 73.00 74.20 16.40
18 188.80 32.60143.80 73.20 16.60 56.60 72.80 74.30 16.70
19 204.50 43.40148.70 73.20 17.30 55.90 73.10 74.40 17.40
20 208.30 46.90149.00 73.30 17.30 56.00 73.20 74.40 17.30
21 208.30 46.70149.20 73.30 17.40 55.90 73.20 74.50 17.40
22 208.30 46.70149.20 73.30 17.40 55.90 73.20 74.50 17.40
23 208.60 47.00149.20 73.40 17.40 56.00 73.20 74.60 17.40
24 208.40 46.60149.40 73.50 17.40 56.10 73.40 74.60 17.30
AVG 193.83 35.94145.49 73.38 16.65 56.73 73.25 74.45 16.65
MAX 208.60 47.00149.40 73.80 17.40 57.30 73.60 74.80 17.40
MIN 188.30 32.00143.70 73.00 16.30 55.90 72.80 74.20 16.30

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 73.7 73.5 32.70 18 12.4
2 0.00 73.6 73.5 32.60 18 12.4
3 0.00 73.5 73.4 32.60 18 12.4
4 0.00 73.4 73.3 32.70 18 12.4
5 0.00 73.0 73.0 32.80 18 12.4
6 0.00 73.2 73.0 32.80 18 12.4
7 0.00 73.5 73.4 32.70 18 12.4
8 0.00 73.7 73.5 32.90 18 12.4
9 0.00 73.8 73.6 32.60 18 12.4
10 0.00 73.6 73.4 32.50 18 12.4
11 0.00 73.4 73.5 32.30 18 12.4
12 0.00 73.4 73.3 32.00 18 12.4
13 0.00 73.4 73.3 32.20 18 12.4
14 0.00 73.3 73.2 32.20 18 12.4
15 0.00 73.2 73.1 32.50 18 12.4
16 0.00 73.1 73.0 32.40 18 12.4
17 0.00 73.1 73.0 32.20 18 12.4
18 0.00 73.2 72.8 32.60 18 12.4
19 0.00 73.2 73.1 43.40 18 12.4
20 0.00 73.3 73.2 46.90 18 12.4
21 0.00 73.3 73.2 46.70 18 12.4
22 0.00 73.3 73.2 46.70 18 12.4
23 0.00 73.4 73.2 47.00 18 12.4
24 0.00 73.5 73.4 46.60 18 12.4
AVG 0.00 73.4 73.3 35.94 18 12.4
MAX 0.00 73.8 73.6 47.00 18 12.4
MIN 0.00 73.0 72.8 32.00 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.