US Army Corps of Engineers

Bonneville Dam

Monday June 1, 2026

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 220.00 56.20151.40 74.80 18.50 56.30 74.60 76.00 18.60
2 219.00 55.40151.20 74.70 18.50 56.20 74.50 75.90 18.50
3 219.10 55.50151.20 74.70 18.50 56.20 74.50 75.90 18.50
4 220.40 56.90151.10 74.60 18.50 56.10 74.40 75.80 18.50
5 229.20 65.90150.90 74.50 18.80 55.70 74.30 75.70 18.90
6 234.40 71.40150.60 74.30 19.00 55.30 74.10 75.60 19.10
7 235.40 72.50150.50 74.30 19.10 55.20 74.10 75.60 19.10
8 234.00 71.10150.50 74.30 19.10 55.20 74.10 75.60 19.20
9 234.00 71.20150.40 74.20 19.10 55.10 74.00 75.50 19.10
10 234.20 71.50150.30 74.20 19.20 55.00 74.10 75.50 19.20
11 234.20 71.50150.30 74.30 19.30 55.00 74.10 75.60 19.30
12 234.10 71.30150.40 74.20 19.20 55.00 74.10 75.60 19.30
13 234.70 72.00150.30 74.20 19.30 54.90 74.10 75.60 19.30
14 234.60 71.90150.30 74.20 19.30 54.90 74.10 75.60 19.30
15 235.00 72.20150.40 74.20 19.40 54.80 74.00 75.60 19.40
16 251.70 89.30150.00 73.90 20.00 53.90 73.90 75.50 19.90
17 265.70 103.60149.70 73.80 20.60 53.20 73.70 75.50 20.50
18 268.20 106.20149.60 73.80 20.70 53.10 73.60 75.50 20.60
19 268.60 106.60149.60 73.70 20.70 53.00 73.60 75.40 20.70
20 268.60 106.60149.60 73.70 20.70 53.00 73.60 75.40 20.70
21 267.20 105.20149.60 73.60 20.80 52.80 73.70 75.40 20.70
22 256.10 93.90149.80 73.80 20.30 53.50 73.80 75.40 20.30
23 243.50 80.90150.20 74.00 19.80 54.20 73.90 75.50 19.80
24 241.70 79.20150.10 74.20 19.60 54.60 74.10 75.40 19.60
AVG 240.98 78.25150.33 74.17 19.50 54.67 74.04 75.59 19.50
MAX 268.60 106.60151.40 74.80 20.80 56.30 74.60 76.00 20.70
MIN 219.00 55.40149.60 73.60 18.50 52.80 73.60 75.40 18.50

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.8 74.6 56.20 18 12.4
2 0.00 74.7 74.5 55.40 18 12.4
3 0.00 74.7 74.5 55.50 18 12.4
4 0.00 74.6 74.4 56.90 18 12.4
5 0.00 74.5 74.3 65.90 18 12.4
6 0.00 74.3 74.1 71.40 18 12.4
7 0.00 74.3 74.1 72.50 18 12.4
8 0.00 74.3 74.1 71.10 18 12.4
9 0.00 74.2 74.0 71.20 18 12.4
10 0.00 74.2 74.1 71.50 18 12.4
11 0.00 74.3 74.1 71.50 18 12.4
12 0.00 74.2 74.1 71.30 18 12.4
13 0.00 74.2 74.1 72.00 18 12.4
14 0.00 74.2 74.1 71.90 18 12.4
15 0.00 74.2 74.0 72.20 18 12.4
16 0.00 73.9 73.9 89.30 18 12.4
17 0.00 73.8 73.7 103.60 18 12.4
18 3.80 73.8 73.6 102.40 18 12.4
19 10.00 73.7 73.6 96.60 18 12.4
20 10.10 73.7 73.6 96.50 18 12.4
21 9.80 73.6 73.7 95.40 18 12.4
22 0.00 73.8 73.8 93.90 18 12.4
23 0.00 74.0 73.9 80.90 18 12.4
24 0.00 74.2 74.1 79.20 18 12.4
AVG 1.40 74.2 74.0 76.85 18 12.4
MAX 10.10 74.8 74.6 103.60 18 12.4
MIN 0.00 73.6 73.6 55.40 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.