US Army Corps of Engineers

Bonneville Dam

Sunday May 31, 2026

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 209.80 47.30150.10 74.00 17.80 56.20 73.80 75.20 17.70
2 209.70 47.10150.20 74.10 17.70 56.40 73.90 75.20 17.70
3 209.90 47.20150.30 74.10 17.70 56.40 73.90 75.30 17.70
4 210.00 47.30150.30 73.90 17.80 56.10 73.80 75.30 17.80
5 219.30 56.90150.00 73.90 18.10 55.80 73.70 75.20 18.10
6 219.50 57.10150.00 74.00 18.20 55.80 73.80 75.20 18.20
7 219.50 57.00150.10 74.10 18.20 55.90 73.90 75.30 18.20
8 219.40 56.90150.10 74.10 18.30 55.80 73.90 75.30 18.30
9 219.70 57.20150.10 74.10 18.40 55.70 73.90 75.30 18.40
10 219.60 57.10150.10 74.10 18.40 55.70 74.00 75.30 18.50
11 219.60 57.00150.20 74.10 18.40 55.70 74.00 75.40 18.50
12 219.90 57.20150.30 74.20 18.40 55.80 74.00 75.50 18.40
13 219.90 57.20150.30 74.20 18.40 55.80 74.10 75.50 18.50
14 220.30 57.50150.40 74.30 18.40 55.90 74.20 75.50 18.40
15 220.20 57.30150.50 74.30 18.40 55.90 74.20 75.50 18.50
16 219.90 57.00150.50 74.30 18.30 56.00 74.20 75.60 18.40
17 220.10 57.20150.50 74.40 18.40 56.00 74.20 75.60 18.40
18 220.70 57.70150.60 74.30 18.40 55.90 74.20 75.70 18.50
19 243.30 80.80150.10 74.00 19.30 54.70 73.80 75.50 19.40
20 244.60 82.20150.00 74.20 19.40 54.80 74.00 75.60 19.40
21 244.70 81.90150.40 74.30 19.60 54.70 74.20 75.70 19.50
22 245.10 82.10150.60 74.30 19.50 54.80 74.20 75.80 19.50
23 244.30 81.20150.70 74.50 19.50 55.00 74.30 75.80 19.50
24 232.40 69.00151.00 74.80 19.10 55.70 74.60 75.90 19.10
AVG 223.81 61.10150.31 74.19 18.50 55.69 74.03 75.47 18.52
MAX 245.10 82.20151.00 74.80 19.60 56.40 74.60 75.90 19.50
MIN 209.70 47.10150.00 73.90 17.70 54.70 73.70 75.20 17.70

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 74.0 73.8 47.30 18 12.4
2 0.00 74.1 73.9 47.10 18 12.4
3 0.00 74.1 73.9 47.20 18 12.4
4 0.00 73.9 73.8 47.30 18 12.4
5 0.00 73.9 73.7 56.90 18 12.4
6 0.00 74.0 73.8 57.10 18 12.4
7 0.00 74.1 73.9 57.00 18 12.4
8 0.00 74.1 73.9 56.90 18 12.4
9 0.00 74.1 73.9 57.20 18 12.4
10 0.00 74.1 74.0 57.10 18 12.4
11 0.00 74.1 74.0 57.00 18 12.4
12 0.00 74.2 74.0 57.20 18 12.4
13 0.00 74.2 74.1 57.20 18 12.4
14 0.00 74.3 74.2 57.50 18 12.4
15 0.00 74.3 74.2 57.30 18 12.4
16 0.00 74.3 74.2 57.00 18 12.4
17 0.00 74.4 74.2 57.20 18 12.4
18 0.00 74.3 74.2 57.70 18 12.4
19 0.00 74.0 73.8 80.80 18 12.4
20 0.00 74.2 74.0 82.20 18 12.4
21 0.00 74.3 74.2 81.90 18 12.4
22 0.00 74.3 74.2 82.10 18 12.4
23 0.00 74.5 74.3 81.20 18 12.4
24 0.00 74.8 74.6 69.00 18 12.4
AVG 0.00 74.2 74.0 61.10 18 12.4
MAX 0.00 74.8 74.6 82.20 18 12.4
MIN 0.00 73.9 73.7 47.10 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.