Draft 2016 Willamette Fish Operation Plan (WFOP)
& Change Forms

Final 2016 WFOP (posted by Mar 28, 2016)

To propose a change to the FOP, submit a completed WFOP Change Form template
Change Form to the WFOP Coordinator. Please make edits to existing text in "Track Changes" to ensure your proposed changes are captured accurately.

* Change forms approved after March 8, 2016, will not be included in the printed version of the 2016 FPP.
Draft Chapters & Appendices
(All edits in track changes)
Change Forms Date Posted* WFPOM Status
1 - Main Document 16WV001 Include Fish-Special Ops Feb 22, 2016  pending
  16WV002 HGMP Feb 22, 2016  pending
  16WV003 Feb 22, 2016  accepted
  16WV004 Clarified Feb 22, 2016  pending
  16WV005 Feb 22, 2016  accepted
  16WV006 Feb 22, 2016  accepted
  16WV007 Feb 22, 2016  accepted
  16WV008 TDG reporting USGS Feb 22, 2016  pending
  16WV009 Feb 22, 2016  accepted
  16WV010 Fish Facility Reporting Feb 22, 2016  pending
  16WV011 Feb 22, 2016  accepted
  16WV012 TDG reporting USGS Feb 22, 2016  pending
  16WV013 Feb 22, 2016  accepted
  16WV014 Feb 22, 2016  accepted
  16WV015 Check Team Names & Roles Feb 22, 2016  pending
  16WV016 Reportable Flow Deviation Feb 22, 2016  pending
  16WV017 Feb 22, 2016  accepted
  16WV019 Fish Operations Appendix Feb 22, 2016  pending
  16WV020 FPP Feb 22, 2016  pending
  16WV021 FPP Feb 22, 2016  pending
  16WV022 FPP Feb 22, 2016  pending
  16WV023 Team Names Feb 22, 2016  pending
  16WV024 Maintenance Schedule Feb 22, 2016  pending
  16WV025 IRRM Feb 22, 2016  pending
  16WV026 Feb 22, 2016  accepted
  16WV027 Feb 22, 2016  accepted
  16WV028 Team Names and Roles Complete Feb 22, 2016  pending
  16WV029 Single Table for Outage Periods Feb 22, 2016  pending
  16WV030 Feb 22, 2016  accepted
  16WV031 Feb 22, 2016  accepted
  16WV032 Facility Fish Delay Feb 22, 2016  pending
  16WV033 Feb 22, 2016  accepted
  16WV034 QC check sheets Feb 22, 2016  pending
  16WV035 Fish Facility Reporting Feb 22, 2016  pending
  16WV036 Feb 22, 2016  accepted
  16WV037 Maintenance Schedule Feb 22, 2016  pending
  16WV038 Feb 22, 2016  accepted
  16WV039 Feb 22, 2016  accepted
  16WV040 Feb 22, 2016  accepted
  16WV041 Feb 22, 2016  accepted
  16WV042 Feb 22, 2016  accepted
  16WV043 Feb 22, 2016  accepted
  16WV044 Coordination combine sections Feb 22, 2016  pending
  16WV045 Feb 22, 2016  accepted
  16WV046 Feb 22, 2016  accepted
  16WV047 Feb 22, 2016  accepted
  16WV048 Fish Operation Decision Comment timeline Feb 22, 2016  pending
  16WV049 Team names Feb 22, 2016  pending
  16WV050 Feb 22, 2016  accepted
  16WV051 HGMP Feb 22, 2016  pending
  16WV052 WFOP review period Feb 22, 2016  pending
 
2 - Appendix A North Santiam
  16NS001 HGMP Feb 22, 2016  pending
  16NS002 Feb 22, 2016  accepted
  16NS003 LRO desc Feb 22, 2016  pending
  16NS004 Feb 22, 2016  accepted
  16NS005 Ramp Increase Normal Special Feb 22, 2016  pending
  16NS006 TDG reporting USGS Feb 22, 2016  pending
  16NS007 Feb 22, 2016  accepted
  16NS008 Temperature target table Feb 22, 2016  pending
  16NS009 TDG BC survival trade off Complete Feb 22, 2016  pending
  16NS010 Feb 22, 2016  accepted
  16NS011 Feb 22, 2016  accepted
  16NS012 Feb 22, 2016  accepted
  16NS013 Fish Disposition Complete Feb 22, 2016  pending
  16NS014 Hatchery mitigation addressed in HGMP Feb 22, 2016  pending
  16NS016 Feb 22, 2016  accepted
  16NS017 Outage periods Feb 22, 2016  pending
  16NS018 Feb 22, 2016  accepted
  16NS019 Feb 22, 2016  accepted
  16NS020 Maintenance BPA Feb 22, 2016  pending
  16NS021 Feb 22, 2016  accepted
  16NS022 Feb 22, 2016  accepted
  16NS023 O&M manual hydraulic criteria details Feb 22, 2016  pending
  16NS024 Complete Detailed Inspection during shutdown Feb 22, 2016  pending
  16NS025 Density during high temps Feb 22, 2016  pending
 
3 - Appendix B South Santiam
  16SS001 HGMP Feb 22, 2016  pending
  16SS002 Feb 22, 2016  accepted
  16SS003 Feb 22, 2016  accepted
  16SS004 Feb 22, 2016  accepted
  16SS005 Feb 22, 2016  accepted
  16SS006 Feb 22, 2016  accepted
  16SS007 Feb 22, 2016  accepted
  16SS008 Feb 22, 2016  accepted
  16SS009 Feb 22, 2016  accepted
  16SS010 Fix numbering Feb 22, 2016  pending
  16SS011 Adult Release Sites Feb 22, 2016  pending
  16SS012 O&M manual hydraulic criteria details Feb 22, 2016  pending
  16SS013 Complete Detailed Inspection during shutdown Feb 22, 2016  pending
  16SS014 Density during high temps Feb 22, 2016  pending
 
4 - Appendix C McKenzie
  16MK001 HGMP Feb 22, 2016  pending
  16MK002 Feb 22, 2016  accepted
  16MK003 Feb 22, 2016  accepted
  16MK004 Feb 22, 2016  accepted
  16MK005 Feb 22, 2016  accepted
  16MK006 Cougar Outplanting Protocols Feb 22, 2016  pending
  16MK007 Feb 22, 2016  accepted
  16MK008 Feb 22, 2016  accepted
  16MK009 Feb 22, 2016  accepted
  16MK010 - add Leaburg pHOS reduction protocol Feb 22, 2016  pending
  16MK011 Actual fish disposition reporting Feb 22, 2016  pending
  16MK012 addresed in HGMP Feb 22, 2016  pending
  16MK013 addressed in 006 CGR outplanting - standalone protocols Feb 22, 2016  pending
  16MK014 Table provided by ODFW Feb 22, 2016  pending
  16MK015 Feb 22, 2016  accepted
  16MK016 Feb 22, 2016  accepted
  16MK017 OM manual hydraulic criteria details Feb 22, 2016  pending
  16MK018 Complete Detailed Inspection during shutdown Feb 22, 2016  pending
  16MK019 Density during high temps Feb 22, 2016  pending
  16MK020 Leaburg Trap Ops Feb 22, 2016  pending
 
5 - Appendix D Middle Fork Willamette
  16MF001 HGMP Feb 22, 2016  pending
  16MF002 Feb 22, 2016  accepted
  16MF003 Feb 22, 2016  accepted
  16MF004 Feb 22, 2016  accepted
  16MF005 Feb 22, 2016  accepted
  16MF006 Feb 22, 2016  accepted
  16MF007 Feb 22, 2016  accepted
  16MF008 Feb 22, 2016  accepted
  16MF009 Feb 22, 2016  accepted
  16MF010 Feb 22, 2016  accepted
  16MF011 Feb 22, 2016  accepted
  16MF012 Feb 22, 2016  accepted
  16MF013 Feb 22, 2016  accepted
  16MF014 HGMP Feb 22, 2016  pending
  16MF015 Feb 22, 2016  accepted
  16MF016 Feb 22, 2016  accepted
  16MF017 stand alone protocols Feb 22, 2016  pending
  16MF018 Dexter outages Feb 22, 2016  pending
  16MF019 Feb 22, 2016  accepted
  16MF020 Feb 22, 2016  accepted
  16MF021 Clean up Refs Withalm Feb 22, 2016  pending
  16MF022 OM manual hydraulic criteria details Feb 22, 2016  pending
  16MF023 Complete Detailed Inspection during shutdown Feb 22, 2016  pending
  16MF024 OM manual hydraulic criteria details Feb 22, 2016  pending
  16MF025 Complete Detailed Inspection during shutdown Feb 22, 2016  pending
  16MF026 Density during high temps Feb 22, 2016  pending
  16MF027 Fish Release fish remain in truck Feb 22, 2016  pending
  16MF028 Adult Fish Release Sites Feb 22, 2016  pending
  16MF029 Adult Fish Release Sites Feb 22, 2016  pending
 
6- Fish Operations Appendix 2016
 
 
Fish Operation Plan Homepage