Final 2010 Fish Passage Plan

March 11, 2010

Complete Document  
  Final 2010 Fish Passage Plan [PDF]
 
Individual Plan Sections  
1 Overview [PDF]
2 Bonneville [PDF]
3 The Dalles [PDF]
Revised Table TDA-6:
10TDA 005 Table TDA 6 Revision - Approved
4 John Day [PDF]
5 McNary [PDF]
Table MCN-11 McNary Dam Spill Pattern During TSW Removal
6 Ice Harbor [PDF]
Table IHR-13 Ice Harbor RSW 45kcfs/Spill Cap Spill Pattern
7 Lower Monumental [PDF]
Revised Table LMN-5:
10LMN 001 LMN Turbine Priority Clarification 3 - Approved
8 Little Goose [PDF]
Revised Tables LGS 11, 12, & 13:
11LGS 001 LGS SW Operations - Approved
9 Lower Granite [PDF]
 
Appendices  
A. Special Project Operations and Studies Bonneville [PDF]
A. Special Project Operations and Studies The Dalles [PDF]
A. Special Project Operations and Studies John Day [PDF]
A. Special Project Operations and Studies McNary [PDF]
A. Special Project Operations and Studies Ice Harbor [PDF]
A. Special Project Operations and Studies Lower Monumental [PDF]
A. Special Project Operations and Studies Little Goose [PDF]
A. Special Project Operations and Studies Lower Granite [PDF]
B. Corps of Engineeers Juvenile Fish Transportation Plan [PDF]
C. BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency [PDF]
D. Corps of Engineers Plan of Action for Dissolved Gas Monitoring in 2010 [PDF]
E. Fish Operations Plan (FOP) [PDF]
F. Guidelines for Dewatering and Fish Handling (Salvage) Plans [PDF]
G. Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor and Lower Granite Dams
*Appendix G has been revised. The revision can be found at:
Appendix G Revised May 19, 2010 - Approved
H. Turbine Dewatering Procedure for Chief Joseph Dam [PDF]
I. List of Acronyms [PDF]
J. Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam [PDF]
K. Protocols for Smolt Monitoring Facility Operations at John Day Dam [PDF]