| Final 2011 Fish Passage Plan | ||
| Individual Plan Sections | ||
| Overview |
|
|
| Bonneville |
|
|
| * 12BON001 Spill Operations Relocated to Appendix E | ||
| * BON Special Spill Pattern - Dec. 29, 2011 | ||
| * BON Special Spill Pattern - Jan. 19, 2012 | ||
| The Dalles |
|
|
| * TDA 6. Spill Pattern Revised April 20, 2011 | ||
| John Day |
|
|
| * JDA 10. Spill Pattern without TSWs | ||
| McNary |
|
|
| Ice Harbor |
|
|
| * Table IHR-12 Ice Harbor RSW 30% Spill Pattern (Revised 5/17/11) | ||
| Lower Monumental |
|
|
| * Table LMN-12 Bulk Spill Pattern | ||
| * Table LMN-13 Uniform Spill Pattern | ||
| * 12LMN001 Spill Operations Relocated to Appendix E | ||
| Little Goose |
|
|
| * 12LGS002 Spill Operations Relocated to Appendix E | ||
| Lower Granite |
|
|
| * 12LWG001 Spill Operations Relocated to Appendix E | ||
| Appendices | ||
| A. Special Project Operations and Studies Bonneville |
|
|
|
*The COE revised 2.2 Adult Kelt Passage at B1 Sluiceway and B2CC: 2.2 Adult Kelt Passage |
||
| A. Special Project Operations and Studies The Dalles |
|
|
| A. Special Project Operations and Studies John Day |
|
|
| A. Special Project Operations and Studies McNary |
|
|
| A. Special Project Operations and Studies Ice Harbor |
|
|
| A. Special Project Operations and Studies Lower Monumental |
|
|
| A. Special Project Operations and Studies Little Goose |
|
|
| A. Special Project Operations and Studies Lower Granite |
|
|
| B. Corps of Engineeers Juvenile Fish Transportation Plan |
|
|
| C. BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency |
|
|
| D. Corps of Engineers Plan of Action for Dissolved Gas Monitoring |
|
|
| E. Fish Operations Plan (FOP) |
|
|
| F. Guidelines for Dewatering and Fish Handling (Salvage) Plans |
|
|
| G. Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor and Lower Granite Dams |
|
|
| H. Turbine Dewatering Procedure for Chief Joseph Dam |
|
|
| I. Dworshak Fish Protection Procedures for Turbine Maintenance |
|
|
| J. Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam |
|
|
| K. Protocols for Smolt Monitoring Facility Operations at John Day Dam |
|
|
| L. List of Acronyms |
|
|