2012 Fish Passage Plan
Draft Sections and Change Forms

To propose a change to the current Fish Passage Plan, please send a change form to the Fish Passage Plan Coordinator.
To ensure your proposed changes are captured accurately, please make all edits to existing text in "Track Changes".

Overview  
Change Forms   12OVE001 - Lamprey Passage  Approved 08-Dec-2011
Bonneville Dam  
Change Forms   12BON001 - PH2 Reduced Nightime Flow  Approved 14-Apr-2011
  12BON002 - Spill Operation Relocated to Appendix E  Approved 14-Jul-2011
  12BON003 - Slow Roll Extended to Year-Round  Approved 20-Jan-2012
  12BON004 - ITS Winter Operations  Approved 20-Jan-2012
  12BON005 - Split Flows Jack Counts  Approved 20-Jan-2012
  12BON006 - Count Window Cleaning  Approved 20-Jan-2012
  12BON007 - Table BON-3 Adult Counting  Approved 20-Jan-2012
  12BON008 - B2CC Gate Hoist Operations  Approved 20-Jan-2012
  12BON009 - VBS Re-installation Criteria  Approved 09-Feb-2012
  12BON010 - B2CC Kelt Operation  Denied 08-Mar-2012
  12BON011 - Table BON-14 Unit Priority for Kelt Operation  Denied 08-Mar-2012
The Dalles Dam  
Change Forms  12TDA001 - Spill Patterns Clarification  Approved 09-Jun-2011
  12TDA002 - Count Window Crowder  Approved 01-Nov-2011
  12TDA003 - Table TDA-4 Unit Priority  Approved 20-Jan-2012
  12TDA004 - Instrument Cleaning  Approved 20-Jan-2012
John Day Dam  
Change Forms  12JDA001 - PDS Dewatering  Approved 01-Nov-2011
  12JDA002 - Spill Operation Relocated to Appendix E  Denied 20-Jan-2012
  12JDA003 - Instrument Cleaning  Approved 20-Jan-2012
McNary Dam  
Change Forms  12MCN001 - TSW Removal  Approved 14-Apr-2011
  12MCN002 - Forebay Debris Removal  Approved 20-Jan-2012
  12MCN003 - Winter Emergency Bypass Procedures  Approved 20-Jan-2012
  12MCN004 - ESBS Cold Weather Operations  Denied 20-Jan-2012
  12MCN005 - Turbine Unit Priority  Approved 20-Jan-2012
  12MCN006 - Winter Trash Rack Maintenance  Approved 20-Jan-2012
  12MCN007 - Emergency Debris Spill - Spillway Weir  Approved 20-Jan-2012
  12MCN008 - North Shore Adult Fishway Entrance Operation  Approved 08-Mar-2012
Ice Harbor Dam  
Change Forms  12IHR001 - Unit Operating Priority  Approved 09-Jun-2011
  12IHR002 - South Shore Auxiliary Water Supply  Approved 20-Jan-2012
  12IHR003 - Emergency Debris Spill RSW  Approved 20-Jan-2012
  12IHR004 - Unit 6 Priority  Denied 20-Jan-2012
Lower Monumental Dam  
Change Forms  12LMN001 - Spill Operations Relocated to Appendix E  Approved 14-Jul-2011
  12LMN002 - Correct Spill Tables  Approved 20-Jan-2012
  12LMN003 - Navigation (Revised 11LMN003)  Denied 20-Jan-2012
  12LMN004 - RSW O&M Procedures  Approved 20-Jan-2012
  12LMN005 - Unit Priority  Approved 20-Jan-2012
  12LMN006 - Emergency Debris Spill RSW  Approved 20-Jan-2012
  12LMN007 - Spill Pattern Change  Denied 09-Feb-2012
Little Goose Dam  
Change Forms  12LGS001 - ESBS VBS Inspection Guidelines  Approved 20-Jan-2012
  12LGS002 - Spill Operations Relocated to Appendix E  Approved 14-Jul-2011
  12LGS003 - Flowmeter  Approved 20-Jan-2012
  12LGS004 - ESBS Cold Weather Operations  Approved 20-Jan-2012
  12LGS005 - Table 5 Unit Priority Footnote  Approved 20-Jan-2012
  12LGS006 - Emergency Debris Spill - Spillway Weir  Approved 20-Jan-2012
  12LGS007 - Tunnel Lights  Denied 20-Jan-2012
Lower Granite Dam  
Change Forms  12LWG001 - Spill Operations Relocated to Appendix E  Approved 14-Jul-2011
  12LWG002 - Emergency Debris Spill RSW  Approved 20-Jan-2012
  12LWG003 - Navigation (Revised 11LWG001)  Denied 20-Jan-2012
  12LWG004 - Tunnel Lights  Approved 20-Jan-2012
  12LWG005 - Adult Ladder Weirgate Test  Approved 09-Feb-2012
  12LWG006 - Table LWG-5 Unit Priority  Approved 08-Mar-12
Appendix A - Special Project Operations and Studies  
Appendix B - Corps of Engineeers Juvenile Fish Transportation Plan  
Change Forms  12AppB001 Transport Minimum Number  Withdrawn 06-Feb-2012
Appendix C - BPA System Load Shaping Guidelines  
Appendix D - Corps of Engineers Plan of Action for TDG Monitoring, 2010-2014  
Appendix E - Fish Operations Plan (FOP)  
Appendix F - Dewatering and Fish Handling Guidelines  
Appendix G - Adult Fish Trapping Protocols at BON, IHR and LWG  
Change Forms  12AppG - BON AFF fish over 100cm  Approved 20-Jan-2012
Appendix H - Turbine Dewatering Procedure for Chief Joseph Dam (Aug. 13, 2002)  
Appendix I - Dworshak Fish Protection Procedures for Turbine Maintenance  
Change Forms  12AppI001 - DWR Fish Protection Measures - Change Justifications  Approved 27-Feb-2012
Appendix J - Juvenile Monitoring Facility Protocols at Bonneville Dam  
Appendix K - Smolt Monitoring Facility Protocols at John Day Dam  
Appendix L - List of Acronyms  

Final 2012 Fish Passage Plan