| 2013 Fish Passage Plan (16 mb) |
|
| Section 1 - Overview |
|
| Section 2 - Bonneville Dam |
|
| Section 3 - The Dalles Dam |
|
| Section 4 - John Day Dam. Updated Table JDA-6 on April 3, 2013. See 13JDA009 |
|
| Section 5 - McNary Dam |
|
| Section 6 - Ice Harbor Dam |
|
| Section 7 - Lower Monumental Dam |
|
| Section 8 - Little Goose Dam Updated Section 2.1.4 on June 30, 2011. See 12LGS002 Spill Operations Relocated to Appendix E |
|
| Section 9 - Lower Granite Dam |
|
| Appendix A - Special Project Operations & Studies |
|
| Appendix B - Corps of Engineeers Juvenile Fish Transportation Plan |
|
| Appendix C - BPA System Load Shaping Guidelines Regarding Turbine Operation & Best Efficiency |
|
| Appendix D - Operations for Non-ESA Listed Fish Species |
|
| Appendix E - Fish Operations Plan (FOP) |
|
| Appendix F - Guidelines for Dewatering and Fish Handling (Salvage) Plans |
|
| Appendix G - Protocols for Adult Fish Trapping Operations at BON, IHR and LWG |
|
| Appendix H - Turbine Dewatering Procedure for Chief Joseph Dam |
|
| Appendix I - Dworshak Dam Fish Protection Procedures for Turbine Maintenance |
|
| Appendix J - Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam |
|
| Appendix K - Protocols for Smolt Monitoring Facility Operations at John Day Dam |
|
| Appendix L - Acronyms |
|