2014 Fish Passage Plan - Draft Sections and Change Forms
Section Draft
Change Form
Last Update
FPOM Review
Section 1 - Overview
14OVE001 - Project Facts & Info
1/23/14
Approved
1/22/14
14OVE002 - TDG Monitoring
1/23/14
Approved
2/13/14
14OVE003 - District Planning
1/23/14
Approved
1/22/14
Section 2 - Bonneville Dam
14BON001 - PH2 Mid-Range Operation
5/8/14
Approved
5/8/14
14BON002 - Slow Roll Operation
5/9/13
Approved
5/9/13
14BON003 - STS Reinstall Criteria
5/9/13
Approved
5/9/13
14BON004 - Wicket Gate Position
5/9/13
Approved
5/9/13
14BON005 - Nav Lock Dewater
1/23/14
Approved
1/22/14
14BON006 - Facts & Info
2/6/14
Approved
1/22/14
14BON007 - Hazing Activities
1/23/14
Approved
1/22/14
14BON008 - Adult Diel Distribution
1/23/14
Approved
1/22/14
14BON009 - Fish Unit Trash Raking
1/23/14
Approved
1/22/14
14BON010 - Unit 1 ITS Chain Gates
1/23/14
Approved
1/22/14
14BON011 - SLEDS Installation
1/23/14
Approved
2/13/14
14BON012 - Modified Minimum FB
7/3/14
Withdrawn
4/10/14
14BON013 - PH2 TIEs
2/12/14
Approved
2/13/14
14BON014 - BOP Definition
2/12/14
Approved
2/13/14
Section 3 - The Dalles Dam
14TDA001 - Wicket Gate Test Time
5/9/13
Approved
5/9/13
14TDA002 - ROV Trashrack Inspection
7/11/13
Approved
7/11/13
14TDA003 - Sluicegate Move Timing
7/11/13
Approved
7/11/13
14TDA004 - Nav Lock Dewater
1/23/14
Approved
1/22/14
14TDA005 - Facts & Info
2/6/14
Approved
1/22/14
14TDA006 - Hazing Activities
1/23/14
Approved
1/22/14
14TDA007 - Synchronize Unit Priority
1/23/14
Approved
1/22/14
14TDA008 - Adult Diel Distribution
1/23/14
Approved
1/22/14
14TDA009 - Split Flows
7/3/14
Withdrawn
6/12/14
14TDA010 - Count Station Picket Leads
1/23/14
Approved
1/22/14
14TDA011 - ITS 8 & 18
1/23/14
Approved
1/22/14
14TDA012 - Delete ITS Test
2/5/15
Approved
1/22/14
Section 4 - John Day Dam
14JDA001 - Wicket Gate Test Time
5/9/13
Approved
5/9/13
14JDA002 - Nav Lock Dewater
1/23/14
Approved
1/22/14
14JDA003 - TSW Operating Dates
1/23/14
Approved
1/22/14
14JDA004 - Facts & Info
2/6/14
Approved
1/22/14
14JDA005 - Hazing Activities
1/23/14
Approved
1/22/14
14JDA006 - Adult Diel Distribution
1/23/14
Approved
1/22/14
14JDA007 - Daytime Spill Schedule
1/23/14
Approved
1/22/14
14JDA008 - North Fishway Entrance Weir
1/23/14
Approved
1/22/14
14JDA009 - North Ladder AWS
1/23/14
Approved
1/22/14
Section 5 - McNary Dam
14MCN001 - SFE & NFE Sill Elevations
1/27/14
Approved
1/22/14
14MCN002 - ESBS/VBS Cleaning
2/6/14
Approved
2/13/14
14MCN003 - Backflush Orifices
2/6/14
Approved
2/13/14
14MCN004 - Reorganize Warm Water Ops
1/27/14
Approved
1/22/14
14MCN005 - Facts & Info
2/6/14
Approved
1/22/14
14MCN006 - Spill Tables TSW Update
1/27/14
Approved
1/22/14
14MCN007 - Forebay Debris Removal
2/10/14
Approved
2/13/14
14MCN008 - No Transport
2/6/14
Approved
2/13/14
14MCN009 - ESBS Inspection
1/27/14
Approved
1/22/14
14MCN010 - Operating Gates Position
1/28/14
Approved
1/22/14
14MCN011 - Diel Graphs
1/27/14
Approved
1/22/14
14MCN012 - Turbine Trash Raking
2/10/14
Approved
2/13/14
Section 6 - Ice Harbor Dam
14IHR001 - Facts & Info
2/6/14
Approved
1/22/14
14IHR002 - Unit Dewatering
1/27/14
Approved
1/22/14
14IHR003 - Diel Graphs
1/27/14
Approved
1/22/14
Section 7 - Lower Monumental Dam
14LMN001 - Unit 1 Priority
1/27/14
Approved
5/9/13
14LMN002 - Diel Graphs
1/27/14
Approved
1/22/14
14LMN003 - Head Gates
1/27/14
Approved
1/22/14
14LMN004 - Facts & Info
2/6/14
Approved
1/22/14
Section 8 - Little Goose Dam
14LGS001 - Facts & Info
2/6/14
Approved
1/22/14
14LGS002 - Spillway Weir Operations
2/6/14
Approved
2/13/14
14LGS003 - ESBS Inspection
1/27/14
Approved
1/22/14
14LGS004 - Low Flow Turbine Ops
1/27/14
Approved
1/22/14
14LGS005 - Diel Graphs
1/27/14
Approved
1/22/14
Section 9 - Lower Granite Dam
14LWG001 - Unit 1 Ops
1/27/14
Approved
1/22/14
 
14LWG002 - Gatewell Orifices
1/31/14
Approved
2/13/14
14LWG003 - ESBS Inspection
1/27/14
Approved
1/22/14
14LWG004 - Facts & Info
2/6/14
Approved
1/22/14
14LWG005 - Turbine Maintenance
1/27/14
Approved
1/22/14
14LWG006 - Diel Graphs
1/27/14
Approved
1/22/14
14LWG007 - Adult Delay Alternative Operations
6/23/14
Not Approved
6/12/14
Appendix A - Special Operations & Studies
--
2/18/14
--
Appendix B - Transportation Plan
14AppB001 - Delete MCN Transport
2/10/14
Approved
2/13/14
14AppB002 - Introduction Revision
2/10/14
Approved
2/13/14
14AppB003 - LMN Collection Start Time
2/10/14
Approved
2/13/14
Appendix C - BPA Load Shaping Guidelines
--
12/31/13
--
Appendix D - Operations for Non-Listed Species
14AppD001 - JDA Lamprey Trap Protocols
1/23/14
Approved
2/13/14
 
14AppD002 - NWW Updates
1/23/14
Approved
2/13/14
 
14AppD003 - BON, TDA Updates
1/23/14
Approved
2/13/14
Appendix E - Fish Operations Plan (FOP)
*Draft review via RIOG*
14AppE001 - Camas-Washougal
2/14/14
Approved
1/22/14
Appendix F - Dewatering Fish Handling Guidelines
--
12/31/13
--
Appendix G - Adult Trap Protocols BON, IHR, LWG
14AppG001 - BON New Observation Tanks
5/13/13
Approved
4/11/13
14AppG002 - IHR New Trap Protocols
4/26/13
Approved
4/26/13
14AppG003 - BON AFF Picket Leads
1/23/14
Partially Approved
2/13/14
Appendix H - CHJ Turbine Dewatering
--
12/31/13
--
Appendix I - DWR Turbine Maintenance
--
12/31/13
--
Appendix J - Smolt Facility Protocols BON, JDA, MCN
14AppJ001 - MCN Sampling Protocols
2/18/14
Approved
2/13/14
Appendix K - Acronyms
--
12/31/13
--
Fish Passage Plan Homepage