| Date |
SOR # |
Submitted by |
Subject |
Disposition |
| 23-Mar-2011 |
2011-01 |
Columbia River Towboat Association |
Lower Granite Pool held at MOP plus 2
feet April through August |
2011-01 |
| 1-Apr-2011 |
2011-01 |
NMFS, USFWS, WDFW, IDFG, ODFW, SBT, CRITFC |
Spill Priority List |
2011-01 |
| 12-Apr-2011 |
2011-02 |
NMFS, USFWS, WDFW, IDFG, ODFW, SBT, CRITFC |
Lower Monumental Spill Pattern |
2011-02 |
| 16-May-2011 |
2011-FWS1 |
USFWS, IDFG |
2011 Libby Dam Releases for Sturgeon and Bull Trout Augmentation |
2011-FWS1 |
| 14-Jun-2011 |
2011-C1 |
CRITFC |
Operation of the Lower Columbia Pools for the Summer 2011 Treatly Fishery |
2011-C1 |
| 24-Jun-2011 |
2011-C2 |
CRITFC |
Operation of the Lower Columbia Pools for the Summer 2011 Treatly Fishery |
2011-C2 |
| 30-Jun-2011 |
2011-C3 |
CRITFC |
Operation of the Lower Columbia Pools for the Summer 2011 Treatly Fishery |
2011-C3 |
| 7-Jul-2011 |
2011-C4 |
CRITFC |
Operation of the Lower Columbia Pools for the Summer 2011 Treatly Fishery |
2011-C4 |
| 19-Jul-2011 |
2011-03 |
NMFS, USFWS, WDFW, IDFG, ODFW, SBT, CRITFC |
Nighttime Spill to the gas cap at Little Goose Dam |
2011-03 |
| 13-Jul-2011 |
2011-C5 |
CRITFC |
Operation of the Lower Columbia Pools for the Summer 2011 Treatly Fishery |
2011-C5 |
| 22-Jul-2011 |
2011-C6 |
CRITFC |
Operation of the Lower Columbia Pools for the Summer 2011 Treatly Fishery |
2011-C6 |
| 1-Aug-2011 |
2011-C7 |
CRITFC |
Operation of the Lower Columbia Pools for the Autumn 2011 Treatly Fishery |
2011-C7 |
| 2-Aug-2011 |
2011-04 |
Kootenai Tribe of Idaho; Sue Ireland, Fish and Wildlife Department Director |
September/October 2011 Libby Dam Outflow for Kootenai River Habitat Restoration Project, Phase 1, Braided Reach |
2011-04 |
| 8-Sep-2011 |
2011-C8 |
CRITFC |
Operation of the Lower Columbia Pools for the Autumn 2011 Treatly Fishery |
2011-C8 |
| 16-Sep-2011 |
2011-C9 |
CRITFC |
Operation of the Lower Columbia Pools for the Autumn 2011 Treatly Fishery |
2011-C9 |
| 23-Sep-2011 |
2011-C10 |
CRITFC |
Operation of the Lower Columbia Pools for the Autumn 2011 Treatly Fishery |
2011-C10 |
| 29-Sep-2011 |
2011-C11 |
CRITFC |
Operation of the Lower Columbia Pools for the Autumn 2011 Treatly Fishery |
2011-C11 |
| 27-Sep-2011 |
USFWS/IDFG-2011-1 |
USFWS, IDFG |
Request to implement a 2011-2012 winter lake elevation of 2051’ and a 2012-2013 winter lake elevation of 2055’
for Lake Pend Oreille, Idaho. |
USFWS/IDFG-2011-1 |
| 8-Nov-2011 |
2011-5 |
FPAC |
2011 Bonneville Chum Operation |
2011-5 |